Dear MATPOWER community, I am experiencing a strange phenomenon when looking at the results of a MATPOWER case I'm running.
I have a system of around 200 buses and 300 generators, and when I solve the system using IPOPT, I receive the following results: >> result.f ans = 6.9125e+05 >> sum(totcost(result.gencost, result.gen(:, PG))) ans = 6.1887e+05 So effectively, my objective function value is 691250 $/h, whereas my total generator cost is just 618870 $/h. Where could this discrepancy come from? If I "manually" calculate the production cost of all dispatched generators at their respective power levels, I receive the exact value from the totcost() function. Are some further shadow costs in the objective function value (result.f)? I have to mention, that the case does converge (result.success = 1) and that I do NOT have any dispatchable loads in the system. I'd be thankful for any hints on where to look for the problem. I can't see it at the moment. Thanks, Best Regards, Patrick