Hey guys

I’m missing some data in my real case analysis. Please advise on the best 
approximation methods and assumptions.

1) Generator (min and max Q limit) - I’ve the power factor and capacity, and i 
suppose the max Q generation can be assumed using the p.f, but how about min Q?
2) Line transfer capacity - I’ve all the impedance, susceptance, and length, 
should i set 9900 in rateA of manpower format? Is this realistic?
3) Generator cost functions - for hydropower, coal power and natural gas 
turbines, how can i best approximate the cost functions?
4) I’ve the load profile (i.e. max load per month at transformers) but i do not 
have the generator data supplying this load. What can i do about this 
considering there are no accurate generation cost functions to run a optimal 
power flow and get a steady state solution?

Many thanks.



Best
Zeya

       
---------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
        Disclaimer:

This message (including any attachments) contains confidential information 
intended for a specific individual and purpose. If you are not the intended 
recipient, you should delete this message and notify the sender and The Hong 
Kong Polytechnic University (the University) immediately. Any disclosure, 
copying, or distribution of this message, or the taking of any action based on 
it, is strictly prohibited and may be unlawful.

The University specifically denies any responsibility for the accuracy or 
quality of information obtained through University E-mail Facilities. Any views 
and opinions expressed are only those of the author(s) and do not necessarily 
represent those of the University and the University accepts no liability 
whatsoever for any losses or damages incurred or caused to any party as a 
result of the use of such information.


Reply via email to