Pgmin = Pgmax = Pg

From: Simone Cochi <[email protected]<mailto:[email protected]>>
Reply-To: MATPOWER discussion forum 
<[email protected]<mailto:[email protected]>>
Date: Wed, 7 Jan 2015 21:41:56 +0100
To: MATPOWER discussion forum 
<[email protected]<mailto:[email protected]>>
Subject: Set generators as not dispatchable

Dear all,
I have to use parts of code that I wrote months ago for a power-flow analysis 
on a distribution grid with photovoltaic generators. At that time, following 
the advise in this discussion 
https://www.mail-archive.com/[email protected]/msg03440.html and set the 
bus of photovoltaic generators as PQ and I added to the generator struct. Now I 
have to do an OPF with that large casefile and add some dispatchable loads. How 
can I set the the photovoltaic generators as not dispatchable so that the power 
they generates is the value I set in Pg?

Thank you