Dear Shri, Ray and others, I am dealing with huge systems in my research. I am running multiple dcpf each time with varied load profile. Each time I run my dcpf, some transmission lines burn. As a result, islands are created. To run another dcpf with my updated system, I need to detect islands first, else my solution does not convert ( I guess you are all aware of this problem). Is there a way to extract all the islands after I run my dcpf. I need to detect all the islands form and keep their statuses at 4 (which means disabled). Can anybody please help me?
Sincerely, Bijay
