Hi all,

I'm doing cascading failure simulation which involves recursively solving power 
flow and checking constraints. I'd like to consider voltage collapse as one of 
the factors. Is it reasonable to think of voltage tripping criterion as 
comparing the voltage solved by ac pf with the V_min provided in the case file? 
I'm aware of the better choice for voltage stability analysis is to do 
continuation pf. But it is targeted at analyzing PV curve for each bus rather 
than directly giving threshold to check. Is there any other efficient way to 
implement this?

Thanks a lot!
Yueyun

Reply via email to