The OPF constraints the flows in the lines to not exceed their limits, so if it
converges, there is no excess flow. See Tables 4-1 and 6-1 in the User’s Manual
<http://www.pserc.cornell.edu/matpower/docs/MATPOWER-manual-5.1.pdf> for
details of the results struct and where the resulting flows are stored.
Ray
> On Jun 15, 2015, at 12:46 AM, lavanya arubolu <[email protected]>
> wrote:
>
> Dear All,
> I am working with congestion management using generation
> rescheduling technique for that i want to know power flows for all the lines
> this can be achieved by using AC OPF. I considered PJM 5-Bus system and run
> AC OPF, the OPF result shows that there is branch flow constraints in the
> line connected between buses 1&5 but it don't give how much extra power flow
> in this line. any one work in this area please help me how to know this data.
> Thank you