Hi All, I want to run an opf where the objective is to minimize voltage variability (i.e keep the voltage across the feeder as close to 1 p.u as possible) how should I structure the cost matrix?
Thanks Thai
Hi All, I want to run an opf where the objective is to minimize voltage variability (i.e keep the voltage across the feeder as close to 1 p.u as possible) how should I structure the cost matrix?
Thanks Thai