Dear Professor: I am a Matpower beginner. I have read some of the emails in Email Archive. And I've learned a lot from those email. But I still have some questions to ask. 1) There is not a lot description about matrix A in 6.3.2 user-defined constraints. Could you please give me a further description about building matrix A. Assume there is a 16 buses system with 6 generations and I want to add one constraint to make the power generation equals to the loads. 2) By far, dispatchable loads is the only way to simulate renewable energy?
Thank you very much. Best, Jun Hao