Mirish,
    Before moving further, I would suggest you to review the practicality of 
the assumptions you are making.
1) Does it make sense to move the loads, generation to a higher voltage level?
2) For a utility engineer working on a real system, would he/she add dummy 
branches to make the analysis converge/feasible?

I don't much about the problem you are trying to solve, but I feel, based on 
the description below, that you should first define the problem clearly with a 
set of assumptions conforming reality.

Shri

> On Jan 21, 2016, at 10:48 AM, Mirish Thakur <[email protected]> wrote:
> 
> Dear all,
> 
> I'm working on network reduction problem, in which I moved loads,all 
> renewable generation and conventional power plants from 110 KV buses to 
> respective connected branches (220 KV or  380 KV). I have modeled network 
> such that distribution of load or generation will be 50 % if more than one 
> branches are connected to 110 KV bus. And after I made branch status 0 of  
> the branches which are connected to 110 KV buses.  When I checked for islands 
> (case_info)  in my file  I found 2 islands and 336 isolated buses. Also I 
> verified it by [group, isolated]=find_island ('myfile'). My question is how 
> to get a full system? I found three buses where generation and load does 
> exist and are completely isolated  and two islands. Also I tried to get full 
> system by putting dummy branches to connect isolated buses and a small island 
> but i'm not sure how to select branch parameters so that problem will be 
> feasible.
> 
> Thanks and regards
> Mirish Thakur