This problem will be handled by MOST (MATPOWER Optimal Scheduling Tool), which
will be included in the imminent MATPOWER 6.
Ray
> On May 17, 2016, at 4:40 PM, Bai, Wenlei <[email protected]> wrote:
>
> Greetings,
> I wonder can matpower OPF solve dynamic OPF problem: the optimal schedule of
> generators over 24 hrs to minimize the total cost?
> In additon to static OPF of each hr constraints, ramping constraints need to
> be satified (the generator cannot increase/decrease too much power within
> short time).
>
> blessings,
> Wenlei
>
> Sent from my iPhone
>