This problem will be handled by MOST (MATPOWER Optimal Scheduling Tool), which 
will be included in the imminent MATPOWER 6.

    Ray

> On May 17, 2016, at 4:40 PM, Bai, Wenlei <[email protected]> wrote:
> 
> Greetings,
> I wonder can matpower OPF solve dynamic OPF problem: the optimal schedule of 
> generators over 24 hrs to minimize the total cost?
> In additon to static OPF of each hr constraints, ramping constraints need to 
> be satified (the generator cannot increase/decrease too much power within 
> short time).
> 
> blessings,
> Wenlei 
> 
> Sent from my iPhone
> 



Reply via email to