Dear Prof. Ray,
I have a question regarding LMP calculation during congestion.
I ran OPF on the 34-node feeder distribution network, feeding from a single 
infinite generator of price 50€/ MWh. It did not converge due to voltage 
congestion, not thermal congestion (there is no line congestion). Then, I 
introduced load curtailment with a price of 100€/MWh. The OPF converged, and at 
the bus of load curtailment the price was 82€/MWh, although I was expecting it 
to be at least 100€/MWh. Do you think I have done something wrong? or is there 
an explanation why thermal congestion is different from voltage congestion?