hi, for getting in touch with optimization in connection with matpower, i want to perform an optimization with a simple 5 bus/4lines ac network.
the 5 busses, the slack, the lines and the loads are set in the casedata. how can i write the possibility for moving the generator on any of the busses for getting less losses in the hole network? for sure i could handle it by hand and move the generator around in this easy example, but it is only for getting to know the method. thank you for your advices :) LG John Parker
