hi,
for getting in touch with optimization in connection with matpower, i want
to perform an optimization with a simple 5 bus/4lines ac network.

the 5 busses, the slack, the lines and the loads are set in the casedata.

how can i write the possibility for moving the generator on any of the
busses for getting less losses in the hole network?

for sure i could handle it by hand and move the generator around in this
easy example, but it is only for getting to know the method.


thank you for your advices :)

LG
John Parker

Reply via email to