Hi Matpower community,

We are solving long time(year) large system(10k nodes) multiperiod dcopf 
problems. In order to do so, we split the whole time interval into smaller 
mp-dcopf runs. This because we run into memory issues caused by the size of the 
system.
As discussed here:
https://www.mail-archive.com/[email protected]/msg05683.html
we enforce the ramp constrain by adding a profile that fixes the PMIN and PMAX 
for the first hour.

I was wondering if there is any other way to solve large systems or is there 
another way to connect intervals of multi-period runs to enforce the ramp 
constrain.

Thanks for your help.

Best,
Kaspar

Reply via email to