Dear Pr Ray.Z,Dear Prefessor , beleave me, I was impressed by your aditional features to unit commtement problem which become a very interesting field I see, and when adding other depending demensions as storage case, contengency cases, variables sources of power generation and thier constraints over the time, that make the problem very complicated, dispatchable loads and price depending over the time of theirs quantitesfinaly I hope receiving a link to some of you vedios lessosns for some features.Sebaa Hall my thanks Le vendredi 17 juillet 2020 à 22:39:41 UTC+2, Ray Daniel Zimmerman <[email protected]> a écrit : It isn’t completely clear what data you have to create your case, but you definitely need both load and generation for the system to make any sense. Total generation is equal to total load plus losses, so you need both. And dispatchable load refers to loads whose quantities are not fixed, but can vary depending on the price. Ray
On Jul 16, 2020, at 10:06 AM, Davide Maglione <[email protected]> wrote: Hello, For my thesys work i am trying to recreate a trasmission network with high penetration of wind power. I have some doubts on how to consider my buses, because in my network there are no loads but only generators and i am considering the buses as the nodes of the system. I have V,I and P datas of each n_i node, so can i put in the 3rd and 4th column of the bus matrix those flow data despite they are not load buses? Finally, what do you mean with “dispatchable load”? Thank you very much, best regards. Davide Maglione | | Mail priva di virus. www.avast.com |
