My understanding is that:

-Fixes to things marked as 1.1 bugs go onto branch.
-Fixes to things not marked as 1.1 bugs (either new features or bugs in
things that are not for 1.1) go to trunk.
-Committers can choose to use private branches for whatever they want
to.

This, from my understanding, is in line with almost every other project
I've seen.  Freezing trunk for the whole time we are preparing a
release is not something I've ever seen, but it's another option that
was brought up.

The question is then:

1. Are backports from the 1.1 branch merged to trunk immediately or
once 1.1 is release?

a). If (1==immediately), who does it, the RM or the dev who committed
it?  The implication, as Josh noted, that if it is the dev then they
need to have two environments setup.

b). If (1!=immediately), who does it at the end?

Suggestion that if we do (b) we could freeze trunk for, say, a week,
and then have individuals manually merge changes based on diffs of
branch and trunk (not patchsets).

Can we have some rapid discussion/turnaround so we can get a process
approved and up on our wiki?

Chris

-- 
Christopher Brooks, BSc, MSc
ARIES Laboratory, University of Saskatchewan

Web: http://www.cs.usask.ca/~cab938
Phone: 1.306.966.1442
Mail: Advanced Research in Intelligent Educational Systems Laboratory
     Department of Computer Science
     University of Saskatchewan
     176 Thorvaldson Building
     110 Science Place
     Saskatoon, SK
     S7N 5C9
_______________________________________________
Matterhorn mailing list
[email protected]
http://lists.opencastproject.org/mailman/listinfo/matterhorn


To unsubscribe please email
[email protected]
_______________________________________________

Reply via email to