Hi Denis, I ran into the ITS guys while they were installing some of the Matterhorn CAs as part of ITS #210, but I haven't seen the schedule for these installs. I need to install six Epiphan devices into some of the same rooms, with the inputs split just before the Matterhorn capture agents. The rooms I see on the list (https://wiki.usask.ca/display/lecturecapture/Lecture+Capture+Equipped+Rooms) are
Arts 134 Arts 143 (done) Thorv 105 Thorv 205a (done) Health Sciences B6 (already split, but I believe the splitting equipment was removed in the spring) What is the deployment schedule for these rooms? Thanks, G