Hi Denis,

I ran into the ITS guys while they were installing some of the
Matterhorn CAs as part of ITS #210, but I haven't seen the schedule for
these installs.  I need to install six Epiphan devices into some of the
same rooms, with the inputs split just before the Matterhorn capture
agents.  The rooms I see on the list
(https://wiki.usask.ca/display/lecturecapture/Lecture+Capture+Equipped+Rooms)
are

Arts 134
Arts 143 (done)
Thorv 105
Thorv 205a (done)
Health Sciences B6 (already split, but I believe the splitting equipment
was removed in the spring)

What is the deployment schedule for these rooms?

Thanks,
G

Attachment: signature.asc
Description: OpenPGP digital signature

_______________________________________________
Matterhorn mailing list
[email protected]
http://lists.opencastproject.org/mailman/listinfo/matterhorn


To unsubscribe please email
[email protected]
_______________________________________________

Reply via email to