CLUSTER RESOURCES, INC.
Newsletter – August 2008

OPTIMIZING YOUR COMPUTE RESOURCES
===============================================================

www.ClusterResources.com/  

NEWS/ANNOUNCEMENTS
1. Events
2. High Productivity HPC
3. Software Updates and Releases: TORQUE 2.3.3
4. Did You Know?: Node Allocation Policies
5. Online Training Sessions
6. FAQs

********************************************************
1. Events

--Web 2.0
Cluster Resources will be exhibiting at the Web 2.0 Expo in New York City, 
September 16-19, at the Javits Center.

--HPC on Wall Street
Cluster Resources will be exhibiting at High Performance on Wall Street, 
September 22, in New York City, at the Roosevelt Hotel.

--SC08
Cluster Resources will be exhibiting at booth #623 at SC08, November 15-21, in 
Austin, TX at the Austin Convention Center.


********************************************************

2. High Productivity HPC

Where: PCPC Direct Headquarters in Houston, TX
When: October 2nd, 11:30am

PCPC Direct is partnering with Microsoft and HP to host High Productivity High 
Performance Computing on October 2, 2008.  This event coincides with the launch 
of Microsoft Windows HPC Server 2008.

The event will begin with a buffet lunch and a keynote speaker followed by two 
breakout sessions.  Both Cluster Resources and JOA will be presenting and 
demonstrating on PCPC’s hybrid boot cluster.

Admission is free.  To register, send and email with your name and contact 
information to [EMAIL PROTECTED]



********************************************************


3.  Software Updates and Releases

--TORQUE 2.3.3 has been released. To download the latest version, go to: 
http://www.clusterresources.com/downloads/torque/

To see changelog details, go to: 
http://www.clusterresources.com/torquedocs20/changelog.shtml#233

This latest version of TORQUE was primarily released to correct a minor bug 
where the pbs_mom would occasionally not connect properly with the pbs_server 
after network failures.  Downloading the latest version of TORQUE is the 
easiest fix; however, for those who cannot upgrade yet, restarting the pbs_mom 
should bring the compute node back to full health.

********************************************************
4. Did You Know: Node Allocation Policies
Node allocation policies allow a site to specify how available resources should 
be allocated to each job. The algorithm used is specified by the parameter 
NODEALLOCATIONPOLICY. There are multiple node allocation policies to choose 
from allowing selection based on reservation constraints, node configuration, 
resource usage, preferences, and other factors. You can specify these policies 
with a system-wide default value or on a per-job basis. Please note that 
LASTAVAILABLE is the default policy.
Other available algorithms include FIRSTAVAILABLE, LASTAVAILABLE, PRIORITY, 
CPULOAD, MINRESOURCE, CONTIGUOUS, MAXBALANCE, FASTEST, and LOCAL.
For more information on Node Allocation Policies go to: 
http://www.clusterresources.com/products/mwm/moabdocs/5.2nodeallocation.shtml



********************************************************
5. Online Training Sessions

Cluster Resources provides live interactive demonstrations to show how easy it 
is to evaluate Moab. These demonstrations go into detail about the tools we 
provide that make the evaluation simple and effective. 

Part 1 of the training covers the use of Moab in a cluster environment, as well 
as the following areas: Moab architecture, installation, diagnostics and 
troubleshooting, admin tools, end user tools, and testing modes.

Part 2 of the training details Moab in a grid environment, including 
information on grid autonomy, credential remapping and other grid specific 
capabilities.

Part 1: Clusters
U.S Time Zones
--Wed., Sept. 17, 2008 1:00 PM - 2:00 PM EDT

Part 2: Grid
U.S Time Zones 
--Wed., Sept. 24, 2008 1:00 PM - 2:00 PM EDT
If these times do not work for you, please contact us at [EMAIL PROTECTED] to 
schedule a demonstration outside the listed times. EMEA training sessions are 
added periodically.
To register for training sessions go to: 
http://clusterresources.com/pages/services/eval-training.php

********************************************************
6. Frequently Asked Questions

Cluster Resources has a Moab Evaluation Product FAQ page located at: 
http://www.clusterresources.com/pages/resources/faq.php.    

********************************************************
Cluster Resources offers FREE evaluation copies of Moab at 
http://www.clusterresources.com/eval. This allows you to evaluate Moab's grid 
and cluster functionality.

During the evaluation period, contact [EMAIL PROTECTED] for free evaluation 
support. 

For more information on Moab Cluster, Grid, or Utility/Hosting Suite go to 
http://clusterresources.com/pages/products.php. 

Contact Us:
Send inquiries regarding Products, Product Feedback, Technical Support, 
Consulting or Custom Development to [EMAIL PROTECTED], or phone 
+1 (801) 717-3700.

Copyright © 2008 Cluster Resources, Inc. All rights reserved.



_______________________________________________
mauiusers mailing list
[email protected]
http://www.supercluster.org/mailman/listinfo/mauiusers

Reply via email to