Thanks Sherry.  Sure enough, Client Center shows them all as “cleanup”.

I’ll give your Compliance Setting a try.

Thanks
Mike




From: [email protected] [mailto:[email protected]] On 
Behalf Of Sherry Kissinger
Sent: Wednesday, June 11, 2014 3:10 PM
To: [email protected]
Subject: Re: [MDT-OSD] SCCM 2012 R2 - TSManager.exe remains after a TS completes

My guess:  Those tsmanager.exe (if you look at them in ClientCenter for 
example) all have a -cleanup on the end.

We opened a case on that, and basically it boiled down to a just-the-wrong-way 
that something was being called before something else was finished.

The bug was not planning on being fixed with a hotfix or in a Cumulative Update.

What we have running is a Compliance setting, which resumes those paused 
processes--because that's what they are.  They are AFTER the TS has completed 
(whether successfully or unsuccessfully, that's irrelevant) and it's doing a 
-cleanup; but it get's paused.  For us anyway, it didn't "hurt" anything, 
except consume memory and look horrid in running processes like you've seen.

 Attached is an export from my lab--I think it works/is the same as what we 
have in production; but just test it.  Import it into your CM12 console 
compliance Settings, it's only a Configuration Item, (no baseline), then make a 
baseline and deploy it to a test box or 2 making sure you check the box about 
"remediate" when you deploy it.  and see if it resumes and clears up all of 
those paused processes.

I basically have this deployed to every box to watch for and resume this stuff.

Please feel free to open a case with Microsoft about this issue to add your 
voice.

Sherry Kissinger

On Wednesday, June 11, 2014 1:37 PM, "Marable, Mike" 
<[email protected]<mailto:[email protected]>> wrote:

We have a task sequence that we will be running on a series of servers.  The TS 
runs from within the full Windows OS and it installs and configures 1E’s PXE 
Lite.

I’ve noticed that after the task sequence completes it leaves behind a 
TSManager.exe process.  Here is a screenshot of Task Manager illustrating it.  
(I hope the image comes through.)


[cid:[email protected]]

Software Center reports that it completed successfully.  I’ve stripped 
everything out of the task sequence, so it literally has nothing in it and the 
problem remains.  So it isn’t something the PXE Lite software is doing.

It’s an SCCM 2012 R2 – CU1 development site.
The client is running Server 2008 R2 – SP1 (client version 5.00.7958.1203).

Any ideas?

Mike Marable
Application Programmer/Analyst Lead
Enterprise Device Engineering and Management
MCTS, MCITP, MCSA, MS 
[Profile<https://www.mcpvirtualbusinesscard.com/VBCServer/MikeMarable/profile>]
--------------------------------------------
"The difficult we do at once. The impossible takes a little longer."
-US Army Corps of Engineers

"It is better to have less thunder in the mouth and more lightning in the hand."
-Apache Proverb

I will rise when I have fallen.

"Unless you try to do something beyond what you have already mastered, you will 
never grow."
-Ralph Waldo Emerson

**********************************************************
Electronic Mail is not secure, may not be read every day, and should not be 
used for urgent or sensitive issues

**********************************************************
Electronic Mail is not secure, may not be read every day, and should not be 
used for urgent or sensitive issues 

Reply via email to