All messages should be posted in plain text.  HTML will be converted to
attachments.    The meditech-l web site is MTUsers.com
======================================


Let me take a stab at these.  We are Magic 5.5.2, 800+ beds across 3 hospitals, 
2,000 users
authorized to do online Purchase and Inventory Requisitions, One MM 
and AP "database", mixture of JIT and Traditional warehouse, using Purchasing 
Facility 
Dictionary vs Facility-Specific Vendor Dictionary pages, since 1979.
 
Your Auditors would probably agree that Meditech's MM-AP-BAR-GL system is one 
of the 
tightest in the industry.  I recognize that the "controls" afforded can be 
"frustrating" 
to new users, and aggravate tensions between MM and AP.  With Meditech's 
system, you must 
realize that your Receivers are Possibly the most important link in the chain.
Typically Purchasing and Accounts Payable staff have to change procedures and 
outlooks. 
 
1. Standing orders.  Be sure you understand the difference between MT STANDING 
and BLANKET 
Order types.  Standings shouldn't be changed. BLANKETS can be. (if you are 
using these 
order types.  We aren't but should be.)  If you are not using these you can 
enter 1 line 
for each month and receive it before month end and BEFORE AP Posts the invoice. 
to avoid the accrual entry for that month.  This is sound for goods that cross 
the receiving 
dock.  For SERVICES, that may not cross the dock, you may have to rely on other 
mechanisms.
Print reports of service type POs, contact departments, use the invoice as a 
receiving 
document, etc.  You should work closely with AP and the Departments on this.
 
Or you can enter 1 line on the PO and receive part of it each month (discussed 
later).
 
 
2. Incorrect Item Shipped.  Don't receive it.  Call the vendor and work it out. 
 AP should 
never pay for anything not received and not on a PO. AP has a routine to offset 
external Credits.
 
3. Partial shipments.  ALWAYS BUILD YOUR PACKAGING STRINGS TO THE LOWEST UNIT 
OF MEASURE!
I can't say this enough! Tape to the inches on the roll. Turkeys to the 10th of 
an oz.
etc.  Many purchasing Departments aren't inclined to do this as they don't 
fully 
understand the implications on bidding reports, AP, and the Receivers.
If your item has a Unit of Purchase of Case, it's packaging string should be 
CA/12 EA.
then the receiving staff can receive 9 EA. This will flow to AP so that the 
invoice 
will match.  (If you are contemplating EDI, be sure your packaging units comply 
with 
ANSI X-12 standards.  Case is CA not CS etc.)
 
(3A. Purchasing departments may also not be inclined to enter the Manufacturer 
Info.
This negates the /MC lookup feature that might be needed when the nurse calls 
down and 
can only read you the Mfgr Cat # that's on the empty box.)
 
4. Change Vendor on a PO. No, you can't.  You should never want to do this 
after a PO was 
issued.  Training may be an issue.  (Strictly Limit use of MISC Vendors).
Users should be made aware of the "Component Search" Functionality as well as 
the numerous 
other Lookup capabilities that MM has to offer.
Void (cancell) the original PO and create a new one. 
 
5. MISC Item at 0.00 cost.  Of course this would impact the accrual.  
Purchasing should 
get a cost before verifying the PO if possible.  Otherwise AP shouldn't pay 
until Purchasing 
fixes the cost on the PO as a result of the invoice.
 
Hope this helps,
 
Rich McNeil
MIS Project Leader
Southcoast Hospitals Group
New Bedford, MA 02740
 
508-961-5836
[EMAIL PROTECTED]
%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%
Thur Jul 6, 2006 2:40 pm                                       From: [EMAIL 
PROTECTED]
 
Subject: Re: [MEDITECH-L] Materials Management  Help
To: [EMAIL PROTECTED]
From: [EMAIL PROTECTED]
Date: Tue, 4 Jul 2006 15:48:49 -0500
 
This is a multipart message in MIME format.
--===============0072699868==
Content-Type: text/plain; charset="us-ascii"
MIME-Version: 1.0
Content-Transfer-Encoding: 7bit
Content-Disposition: inline
 
All messages should be posted in plain text.  HTML will be converted to
attachments.    The meditech-l web site is MTUsers.com
======================================
 
 
--===============0072699868==
Content-Type: multipart/alternative;
        boundary="=_alternative 007254C5862571A1_="
 
This is a multipart message in MIME format.
--=_alternative 007254C5862571A1_=
Content-Type: text/plain; charset="US-ASCII"
 
Please post responses to list.  We just went live with MM on July 1 & are
very interested in how other facilities are handling the following issues
also.
 
Thanks in advance,
Valorie Comley
Assistant Controller
Memorial Hospital
Belleville, Illinois
 
 
 
 
"Munir Khmamis" <[EMAIL PROTECTED]>
Sent by: [EMAIL PROTECTED]
07/03/2006 10:13 AM
Please respond to
[EMAIL PROTECTED]
 
 
To
[email protected]
cc
 
Subject
[MEDITECH-L] Materials Management  Help
 
 
 
 
 
 
All messages should be posted in plain text.  HTML will be converted to
attachments.    The meditech-l web site is MTUsers.com
======================================
 
 
All,
 
1.  We are looking for a less involved / more straight forward process for
handling standing orders and service contract set up. On the material
management end we have trouble with entering one line items for a 12 month
contract-and then what we do is receive that line in monthly after the
invoice is posted through A/P and shows up on the exception report.
Sometimes this causes an accrual issue. Is there an easier way so that
this
accrual doesn't happen?
 
 
2. When an incorrect item is delivered to the company and it is not on any
Purchase Order because it was never really ordered, how do you receive it
in and then do a return PO? (The invoices usually reflect a cost for this
incorrect item and then the company issues a credit).
 
 
3.  What do you do when a partial line item is delivered. An example would
be if you ordered in "1 case" (12each) of something and the company only
sends 9 of the 12? An invoice will reflect the charge for only 9, and then
a follow up invoice would be for the 3 that are delivered at a later date.
If there are 2 invoices for the one line item, it can't be matched to the
packing slip ?
 
 
4. Is there anyway to do maintenance on a purchase order? such as vendor
changes,without canceling the original PO and doing a whole new one?
Another reason we would want to change the vendor is because the materials
management people may "pick" a Misc vendor not knowing that there is an
actual vendor in the dictionary.
 
 
5. If an item is ordered as a misc. item at 0.00 dollars and then received
in  at 0.00 dollars and then invoiced for the real price, wouldn't this
cause an accrual problem if the invoice was entered in the following
month?
 
 
Terri April
Accounting Supervisor
(315)591-9420
Albert Lindley Lee Memorial Hospital
510 South Forth Street
Fulton, New York 13069
 
 
 
 
 
 
 
 
 
_______________________________________________
meditech-l mailing list
[email protected]
http://mtusers.com/mailman/listinfo/meditech-l
 
 
--=_alternative 007254C5862571A1_=
Content-Type: text/html; charset="US-ASCII"
 
 
<br><font size=2 face="sans-serif">Please post responses to list. &nbsp;We
just went live with MM on July 1 &amp; are very interested in how other
facilities are handling the following issues also.</font>
<br>
<br><font size=2 face="sans-serif">Thanks in advance,</font>
<br><font size=2 face="sans-serif">Valorie Comley<br>
Assistant Controller<br>
Memorial Hospital<br>
Belleville, Illinois<br>
</font>
<br>
<br>
<br>
<table width=100%>
<tr valign=top>
<td width=40%><font size=1 face="sans-serif"><b>&quot;Munir Khmamis&quot;
&lt;[EMAIL PROTECTED]&gt;</b> </font>
<br><font size=1 face="sans-serif">Sent by: [EMAIL PROTECTED]</font>
<p><font size=1 face="sans-serif">07/03/2006 10:13 AM</font>
<table border>
<tr valign=top>
<td bgcolor=white>
<div align=center><font size=1 face="sans-serif">Please respond to<br>
[EMAIL PROTECTED]</font></div></table>
<br>
<td width=59%>
<table width=100%>
<tr>
<td>
<div align=right><font size=1 face="sans-serif">To</font></div>
<td valign=top><font size=1 face="sans-serif">[email protected]</font>
<tr>
<td>
<div align=right><font size=1 face="sans-serif">cc</font></div>
<td valign=top>
<tr>
<td>
<div align=right><font size=1 face="sans-serif">Subject</font></div>
<td valign=top><font size=1 face="sans-serif">[MEDITECH-L] Materials Management
&nbsp;Help</font></table>
<br>
<table>
<tr valign=top>
<td>
<td></table>
<br></table>
<br>
<br>
<br><font size=2><tt>All messages should be posted in plain text. &nbsp;HTML
will be converted to<br>
attachments. &nbsp; &nbsp;The meditech-l web site is MTUsers.com<br>
======================================<br>
<br>
<br>
All,<br>
<br>
1. &nbsp;We are looking for a less involved / more straight forward process
for<br>
handling standing orders and service contract set up. On the material<br>
management end we have trouble with entering one line items for a 12 month<br>
contract-and then what we do is receive that line in monthly after the<br>
invoice is posted through A/P and shows up on the exception report.<br>
Sometimes this causes an accrual issue. Is there an easier way so that
this<br>
accrual doesn't happen?<br>
<br>
<br>
2. When an incorrect item is delivered to the company and it is not on
any<br>
Purchase Order because it was never really ordered, how do you receive
it<br>
in and then do a return PO? (The invoices usually reflect a cost for this<br>
incorrect item and then the company issues a credit).<br>
<br>
<br>
3. &nbsp;What do you do when a partial line item is delivered. An example
would<br>
be if you ordered in &quot;1 case&quot; (12each) of something and the company
only<br>
sends 9 of the 12? An invoice will reflect the charge for only 9, and then<br>
a follow up invoice would be for the 3 that are delivered at a later date.<br>
If there are 2 invoices for the one line item, it can't be matched to the<br>
packing slip ?<br>
<br>
<br>
4. Is there anyway to do maintenance on a purchase order? such as vendor<br>
changes,without canceling the original PO and doing a whole new one?<br>
Another reason we would want to change the vendor is because the materials<br>
management people may &quot;pick&quot; a Misc vendor not knowing that there
is an<br>
actual vendor in the dictionary.<br>
<br>
<br>
5. If an item is ordered as a misc. item at 0.00 dollars and then received<br>
in &nbsp;at 0.00 dollars and then invoiced for the real price, wouldn't
this<br>
cause an accrual problem if the invoice was entered in the following month?<br>
<br>
<br>
Terri April<br>
Accounting Supervisor<br>
(315)591-9420<br>
Albert Lindley Lee Memorial Hospital<br>
510 South Forth Street<br>
Fulton, New York 13069<br>
<br>
<br>
<br>
<br>
<br>
<br>
<br>
<br>
<br>
_______________________________________________<br>
meditech-l mailing list<br>
[email protected]<br>
http://mtusers.com/mailman/listinfo/meditech-l<br>
</tt></font>
<br>
--=_alternative 007254C5862571A1_=--
 
--===============0072699868==
Content-Type: text/plain; charset="us-ascii"
MIME-Version: 1.0
Content-Transfer-Encoding: 7bit
Content-Disposition: inline
 
_______________________________________________
meditech-l mailing list
[email protected]
http://mtusers.com/mailman/listinfo/meditech-l
 
--===============0072699868==--
 
--------------------------------------------------------------------------------
Return-Path: <[EMAIL PROTECTED]>
Received: from southcoast.org by SLH.ORG;  Thu, 06 Jul 2006 14:40:58 0000
Received: from smtp1.slh.southcoast.org (unverified [10.0.0.48]) by 
southcoast.org
 (Rockliffe SMTPRA 6.1.17) with SMTP id <[EMAIL PROTECTED]> for <[EMAIL 
PROTECTED]>;
 Thu, 6 Jul 2006 14:40:20 -0400
Received: from prosonic.com ([204.202.252.254])
 by smtp1.slh.southcoast.org (SAVSMTP 3.1.6.45) with SMTP id 
M2006070614401922785
 for <[EMAIL PROTECTED]>; Thu, 06 Jul 2006 14:40:19 -0400
Received: from prosonic.iserver.net (localhost [127.0.0.1])
        by prosonic.com (8.13.6.20060614/8.13.1) with ESMTP id k66IYMDE062529;
        Thu, 6 Jul 2006 18:34:44 GMT
Received: from mail.memhosp.com (mail.memhosp.com [216.91.169.4])
        by prosonic.com (8.13.6.20060614/8.13.1) with SMTP id k64Kn2tg033242
        for <[email protected]>; Tue, 4 Jul 2006 20:49:03 GMT
Received: (qmail 22285 invoked by uid 89); 4 Jul 2006 20:48:57 -0000
Received: by simscan 1.2.0 ppid: 22272, pid: 22282, t: 0.7053s
        scanners: regex: 1.2.0 attach: 1.2.0 clamav: 0.88.2/m:39/d:1584
Received: from domino.pmmc.com (10.2.51.1)
        by 192.168.253.4 with SMTP; 4 Jul 2006 20:48:56 -0000
In-Reply-To: <[EMAIL PROTECTED]>
To: [EMAIL PROTECTED]
Subject: Re: [MEDITECH-L] Materials Management  Help
MIME-Version: 1.0
X-Mailer: Lotus Notes Release 6.5.1 January 21, 2004
Message-ID: <[EMAIL PROTECTED]>
From: [EMAIL PROTECTED]
Date: Tue, 4 Jul 2006 15:48:49 -0500
X-MIMETrack: Serialize by Router on domino/Pmmc(Release 6.5.1|January 21,
        2004) at 07/04/2006 03:48:56 PM,
        Serialize complete at 07/04/2006 03:48:56 PM
X-Mailman-Approved-At: Thu, 06 Jul 2006 13:17:24 +0000
Cc: [EMAIL PROTECTED], [email protected]
X-BeenThere: [email protected]
X-Mailman-Version: 2.1.5
Precedence: list
List-Id: Email list for Meditech users <meditech-l.MTUsers.com>
List-Unsubscribe: <http://mtusers.com/mailman/listinfo/meditech-l>,
        <mailto:[EMAIL PROTECTED]>
List-Archive: <http://prosonic.iserver.net/pipermail/meditech-l>
List-Post: <mailto:[email protected]>
List-Help: <mailto:[EMAIL PROTECTED]>
List-Subscribe: <http://mtusers.com/mailman/listinfo/meditech-l>,
        <mailto:[EMAIL PROTECTED]>
Content-Type: multipart/mixed; boundary="===============0072699868=="
Sender: [EMAIL PROTECTED]
Errors-To: [EMAIL PROTECTED]
 
%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%



CONFIDENTIALITY NOTICE:
This e-mail and any files transmitted with it are confidential and may contain 
health information protected by law.  Any unauthorized use or disclosure is 
strictly prohibited.  If you are not the intended recipient, please notify the 
sender by return email, delete this email, and destroy any copies.  Please note 
that any views or opinions presented in this e-mail are solely those of the 
author and do not necessarily represent those of Southcoast.  The recipient 
should check this e-mail and any attachments for the presence of viruses. 
Southcoast accepts no liability for any damage caused by any virus transmitted 
by this e-mail.



_______________________________________________
meditech-l mailing list
[email protected]
http://mtusers.com/mailman/listinfo/meditech-l

Reply via email to