It collapsed during a post-tensioning operation, but the cause was an error by the engineering firm that designed it.
MG via Mercedes <mercedes@okiebenz.com> writes: > I believe it was incorrect tension. > > OK Don via Mercedes wrote: >> The presence, or lack of them caused the collapse? >> >> On Thu, Oct 31, 2019 at 2:01 PM Randy Bennell via Mercedes < >> mercedes@okiebenz.com> wrote: >> >>>> Post tensioning cables. >>>> >>>> -D >>> Is that not what caused the problem with that pedestrian bridge to some >>> university down your way, that collapsed? >>> >>> Randy >>> >> >> > > _______________________________________ > http://www.okiebenz.com > > To search list archives http://www.okiebenz.com/archive/ > > To Unsubscribe or change delivery options go to: > http://mail.okiebenz.com/mailman/listinfo/mercedes_okiebenz.com > _______________________________________ http://www.okiebenz.com To search list archives http://www.okiebenz.com/archive/ To Unsubscribe or change delivery options go to: http://mail.okiebenz.com/mailman/listinfo/mercedes_okiebenz.com