Vinod Kone created MESOS-305:
--------------------------------

             Summary: Inform the framework about a master failover
                 Key: MESOS-305
                 URL: https://issues.apache.org/jira/browse/MESOS-305
             Project: Mesos
          Issue Type: Improvement
            Reporter: Vinod Kone


With the recent changes in the master detecter code, we no longer send 
'NoMasterDetected' to the scheduler driver, which in turn means the 
'disconnected' scheduler callback is never invoked.

At Twitter this manifested as a spew of LOST tasks whenever a master failover 
happens. This is because the scheduler holds on to offers for a while and never 
knows about the invalidity of offers, until after tasks are launched. Though 
this is a race, it is ideal to minimize this window as much as possible by 
informing the scheduler of the master failover.

--
This message is automatically generated by JIRA.
If you think it was sent incorrectly, please contact your JIRA administrators
For more information on JIRA, see: http://www.atlassian.com/software/jira

Reply via email to