Hi,

I'm interested in a run of the river scheme with a potential of at 
least 300kW. It consists of a 2m head, 45 degree straight concrete 
weir with flat river banks. Assuming 75% total efficiency, this means 
a flow of 27 cumecs would be needed through a turbine (the scheme 
would be capital rather than flow limited, such that 300kW should be 
possible for most of the year, apart from flood conditions causing 
the head to drop/disappear).

Looking at various studies on the net, the assumed cost/kW for 
microhydro schemes vary considerably from less than �1000
($1750) to over �3000. This isn't very helpful, so I would
appreciate any figures the group could suggest for the breakdown of a 
typical low head scheme.

I know its an impossible question (how long is a piece of string!), 
but perhaps someone can offer some typical breakdowns between the 
civil works/turbine/trash-racks/generators and controls/management 
and consultancy for this type of scheme. (I can get estimates for 
grid connection costs). I'm assuming that lower cost fixed pitch 
propellor turbines would be appropriate rather than expensive kaplans 
given the capital rather than flow limitations. Also being in the UK 
my understanding is that fine pitch screening would be required 
(don't want the cormorants to go hungry!) - given the capital 
limitations I'm assuming a manual rather than automatic trash rack 
cleaning solution would be appropriate).

I am assuming that the civil works costs are likely to dominate - 
particularly for a low head scheme, and probably the hardest to 
estimate. Obviously a site survey would help considerably but I'm 
only at the stage of considering if this is remotely feasable. In 
this case I expect that access and excavation conditions should be 
benign (clay/shale - no rock) so I'm guessing that a large part of 
the cost would be for sheet piling to prevent water ingress into the 
excavation. Is this a reasonable assumption?

What about possible solutions avoiding the need for sheet piling - 
eg. (please don't laugh too violently - I'm not a 
mechanical/hydraulic engineer!) dropping precast channel sections 
into a flooded excavation and pumping mass concrete underneath?
 
How big a channel would be required to be excavated for the head and 
tailraces and turbine for that 27 cumecs flow? I'm assuming that 
a .1m (5%) head loss might be reasonable, but as I'm not a hydraulic 
engineer, any suggestions?

Thats quite enough for one post, so please accept my thanks in 
advance for any suggestions/advice/well-deserved-ridicule you may 
wish to offer,

Splynk




------------------------ Yahoo! Groups Sponsor ---------------------~-->
Make a clean sweep of pop-up ads. Yahoo! Companion Toolbar.
Now with Pop-Up Blocker. Get it for free!
http://us.click.yahoo.com/L5YrjA/eSIIAA/yQLSAA/FGYolB/TM
---------------------------------------------------------------------~->

Does your company feature in the microhydro business directory at 
http://microhydropower.net/directory ? If not, please register free of charge and be 
exposed to the microhydro community world wide!

NOTE: The advertisements in this email are added by Yahoogroups who provides us with 
free email group services. The microhydro-group does not endorse products or support 
the advertisements in any way. 

More information on micro hydropower at http://microhydropower.net

To unsubscribe: send empty message to [EMAIL PROTECTED] 
Yahoo! Groups Links

<*> To visit your group on the web, go to:
     http://groups.yahoo.com/group/microhydro/

<*> To unsubscribe from this group, send an email to:
     [EMAIL PROTECTED]

<*> Your use of Yahoo! Groups is subject to:
     http://docs.yahoo.com/info/terms/
 

Reply via email to