> Thanks for doing this research and laying out your findings 
> so clearly. 

Sure :-)

> 
> Questions/comments inline 
> 
> > 1. I could not find anywhere to configure the fiscal year. 
> > However I see that the code uses gregorian calendar.  
> 
> I'll make sure that we clarify in the functional spec that 
> the fiscal year can't be configured in Mifos-- and that it is 
> assumed to be Jan 1st.  
> 

I did read on the functional spec that Fiscal year should be configurable,
but I think it was missed in the implementation 

> > 2. When I created a savings product (today 04-Dec-07) with 
> 30 days for 
> > interest calculation on min balance and 6 months for 
> posting, in the 
> > database it recorded the LAST_INT_CALC_DATE = NULL 
> NEXT_INT_CALC_DATE 
> > = 2007-12-22 NEXT_INT_POST_DATE = 2008-01-31
> 
> So from your note below, it sounds like Mifos starts counting 
> the interest calculation date from the first of the fiscal 
> year-- hence Dec 22nd.
> 
> In terms of the interest posting date-- im not sure why mifos 
> calculates this date as the end of January.  Seems like it 
> should be the End of December as per the FS.

Correct. It should have been December 31st. 

>  
> > When I changed the system date so that it would calculate the 
> > interest, the dates were changed to LAST_INT_CALC_DATE =
> > 2007-12-22 NEXT_INT_CALC_DATE = 2007-01-21 NEXT_INT_POST_DATE = 
> > 2008-01-31
> >
> > 
> > >From the functional spec for savings product
> > http://www.mifos.org/knowledge/functional-specs/product-defini
> > tion#savings
> > I see that the "Time period for interest rate calculation" 
> > has a note "Reference for time period is the start of 
> fiscal year for 
> > all product instances."
> 
> I'll make sure the functional spec clarifies that the fiscal 
> year is assumed to be Jan 1st.
> 
> > And for "Frequency of interest posting to accounts" has a note  
> > "Interest should be posted on the last day of the month for all the 
> > accounts."
> 
> Yep, I remember this.  I believe I'm to blame for this 
> requirement :-) .
> I didn't think there would ever be a need to post interest 
> mid-month and I wanted to keep the requirements simple for 
> our first release.

I think as we MIFOS gets into supporting multiple calendar systems, we will
have to revisit these kinds of requirements

> > What this means is that my months are based on number of 
> days so if I 
> > say 30 days, then in december (based on the Jan 1st fiscal 
> year), my 
> > interest calculation date becomes 2007-12-22, however the 
> posting will 
> > only happen at the end of the gregorian month (which in my example, 
> > even when I had selected 6 months, the date became the end 
> of the next 
> > month).
> 
> Yeah, this seems like a bug.  Should be Dec 31st.

It does sound like a bug, perhaps someone else can verify it as well and
then we can log it as a defect. The next int post date comes out to July
31st instead of Jun 30th.

> > How are other MFI's setting these parameters, and how is it 
> expected 
> > to be calculated? Am I missing something here?..
> 
> I believe we only have 1 MFI that has savings accounts-- Jitegemea.
> Hopefully they will respond with some feedback

Doesn't Grameen Koota use this functionality? I was hoping to get some
feedback from them as well.



-------------------------------------------------------------------------
SF.Net email is sponsored by:
Check out the new SourceForge.net Marketplace.
It's the best place to buy or sell services
for just about anything Open Source.
http://ad.doubleclick.net/clk;164216239;13503038;w?http://sf.net/marketplace

Reply via email to