[
http://mifosforge.jira.com/browse/MIFOS-3480?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel
]
Udai Gupta updated MIFOS-3480:
------------------------------
Description:
Interest Calculation Batch Job uses SavingsBO.interestToBePosted (bucket) field
for communicate to Interest posting job.
E.g 1 month interest calculation and 3 month interest posting freq.
SavingsBO.interestToBePosted is zero (bucket is empty)
1 month interest calculation puts 20 -> in SavingsBO.interestToBePosted ( 0 +
20 = 20)
2 " " " " 25 -> in SavingsBO.interestToBePosted (20 +
25 = 45)
3 " " " " 30 -> in SavingsBO.interestToBePosted (45 +
30 = 75)
3 month interest posting takes total from SavingsBO.interestToBePosted and
posts that.
if the 3 month interest calculation fails then the interest posting will be
done at 45 instead of 75
If interest calculation job fails due to some error/exception it will leave the
bucket empty (or in inconsistent state) which will cause a zero (or less)
interest posting.
was:
Interest Calculation Batch Job uses SavingsBO.interestToBePosted (bucket) field
for communicate to Interest posting job.
If interest calculation job fails due to some error/exception it will leave the
bucket empty (or in inconsistent state) which will cause a zero (or less)
interest posting.
> Interest Calculation Batch Job failure can result in zero interest posting
> --------------------------------------------------------------------------
>
> Key: MIFOS-3480
> URL: http://mifosforge.jira.com/browse/MIFOS-3480
> Project: mifos
> Issue Type: Bug
> Components: Batch jobs, Savings Account
> Affects Versions: Release 1.6.0
> Reporter: Udai Gupta
> Assignee: mifosdeveloperqueue
> Priority: Major
> Fix For: Unscheduled
>
>
> Interest Calculation Batch Job uses SavingsBO.interestToBePosted (bucket)
> field for communicate to Interest posting job.
> E.g 1 month interest calculation and 3 month interest posting freq.
> SavingsBO.interestToBePosted is zero (bucket is empty)
> 1 month interest calculation puts 20 -> in SavingsBO.interestToBePosted ( 0 +
> 20 = 20)
> 2 " " " " 25 -> in SavingsBO.interestToBePosted (20 +
> 25 = 45)
> 3 " " " " 30 -> in SavingsBO.interestToBePosted (45 +
> 30 = 75)
> 3 month interest posting takes total from SavingsBO.interestToBePosted and
> posts that.
> if the 3 month interest calculation fails then the interest posting will be
> done at 45 instead of 75
> If interest calculation job fails due to some error/exception it will leave
> the bucket empty (or in inconsistent state) which will cause a zero (or less)
> interest posting.
--
This message is automatically generated by JIRA.
-
If you think it was sent incorrectly contact one of the administrators:
http://mifosforge.jira.com/secure/Administrators.jspa
-
For more information on JIRA, see: http://www.atlassian.com/software/jira
------------------------------------------------------------------------------
The Palm PDK Hot Apps Program offers developers who use the
Plug-In Development Kit to bring their C/C++ apps to Palm for a share
of $1 Million in cash or HP Products. Visit us here for more details:
http://ad.doubleclick.net/clk;226879339;13503038;l?
http://clk.atdmt.com/CRS/go/247765532/direct/01/
_______________________________________________
Mifos-issues mailing list
[email protected]
https://lists.sourceforge.net/lists/listinfo/mifos-issues