Ensure ETL caters for initial load and subsequent periodic runs
----------------------------------------------------------------
Key: MIFOS-3623
URL: http://mifosforge.jira.com/browse/MIFOS-3623
Project: mifos
Issue Type: Story
Components: Reports Module
Reporter: johnwoodlock
Assignee: johnwoodlock
Priority: Major
ETL work may require an initial data loading and then the normal operational
periodic runs for incremental loading.
Both types of run require some staging infrastructure (tables in a staging
database) that allow restart, audit, logging type functionality.
--
This message is automatically generated by JIRA.
-
If you think it was sent incorrectly contact one of the administrators:
http://mifosforge.jira.com/secure/Administrators.jspa
-
For more information on JIRA, see: http://www.atlassian.com/software/jira
------------------------------------------------------------------------------
This SF.net Dev2Dev email is sponsored by:
Show off your parallel programming skills.
Enter the Intel(R) Threading Challenge 2010.
http://p.sf.net/sfu/intel-thread-sfd
_______________________________________________
Mifos-issues mailing list
[email protected]
https://lists.sourceforge.net/lists/listinfo/mifos-issues