[ 
http://mifosforge.jira.com/browse/MIFOS-3744?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel
 ]

Surabhi Choubey updated MIFOS-3744:
-----------------------------------

    Story Points: 5  (was: 3)

> Encapsulate all integration tests within a transaction scope so that they run 
> faster and do not affect each other by changing the database state
> ------------------------------------------------------------------------------------------------------------------------------------------------
>
>                 Key: MIFOS-3744
>                 URL: http://mifosforge.jira.com/browse/MIFOS-3744
>             Project: mifos
>          Issue Type: Story
>    Affects Versions: Elsie F
>            Reporter: Vivek Singh
>            Assignee: Praveena
>             Fix For: Elsie F - Iteration 2
>
>   Original Estimate: 1 week
>  Remaining Estimate: 1 week
>
> This Technical work is required to bring down the build times on the CI as 
> well as on the local developer machine significantly.
> The expectation is:
> - On CI, the build time would come down from 30 mins to 20 mins, giving us a 
> gain of about 10 mins per build.
> - On the local developer machines, the build time is expected to be brought 
> down from the current levels of about 50 mins to about 20 minutes. 
> Tasks:
> Use the spike commited to integration-test-perf branch which has initial 
> piece of work.
> Make the 163 odd failing test pass.
> Commit the changes to agriculturalLoan branch.

-- 
This message is automatically generated by JIRA.
-
If you think it was sent incorrectly contact one of the administrators: 
http://mifosforge.jira.com/secure/Administrators.jspa
-
For more information on JIRA, see: http://www.atlassian.com/software/jira

        

------------------------------------------------------------------------------
Increase Visibility of Your 3D Game App & Earn a Chance To Win $500!
Tap into the largest installed PC base & get more eyes on your game by
optimizing for Intel(R) Graphics Technology. Get started today with the
Intel(R) Software Partner Program. Five $500 cash prizes are up for grabs.
http://p.sf.net/sfu/intelisp-dev2dev
_______________________________________________
Mifos-issues mailing list
[email protected]
https://lists.sourceforge.net/lists/listinfo/mifos-issues

Reply via email to