[ 
http://mifosforge.jira.com/browse/MIFOS-3595?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel
 ]

Kay Chau updated MIFOS-3595:
----------------------------

    Fix Version/s:     (was: Elsie F)
                   Release G

> LSIM installment loan payment required at first available repayment day
> -----------------------------------------------------------------------
>
>                 Key: MIFOS-3595
>                 URL: http://mifosforge.jira.com/browse/MIFOS-3595
>             Project: mifos
>          Issue Type: Bug
>          Components: Loan Account
>    Affects Versions: Release 1.5
>         Environment: 1.5.x or higher with LSIM turned on
>            Reporter: jbrewster
>            Assignee: Kay Chau
>             Fix For: Release G
>
>
> Logging the issue posed by Miguel in this user list email  -  
> http://tinyurl.com/2577opx.
> Would like PM team to confirm desired behavior for this scenario of LSIM 
> payment.  - should mimic behavior for loan payment with LSIM off?
> -------------------
> We are deploying MIFOS 1.5 on our client where LSIM is mandatory.
> When we define our loan product as the example below using LSIM the loan 
> schedule does not rut the 9 months for the frequency of installments.
> Product instance name: Empréstimo Agrícola
> Short name: Agri
> Product category: Empréstimo Agrícola
> Start date: 29/06/2010 
> End date: 29/06/2015 
> Applicable for: Clientes 
> Include in Loan cycle counter: Yes 
> Calculate Loan Amount as: Same for all loans 
> Min loan amount       Max loan amount Default amount
> 1000.0        20000.0 5000.0
> Taxa de Interest 
> Tipo de taxa de Interest: Plano 
> Taax Máxima de Interest: 36.0 %
> Taxa mínima de Interest: 36.0 %
> Taxa padrão de Interest: 36.0 %
> Repayment schedule 
> Frequency of installments: 9 month(s) 
> Calculate # of Installments as: Same for all Loans 
> Min # of installments Max # of installments   Default # of installments
> 1     1       1
> Grace period type: Nenhum (none)
> Grace period duration: 0 installments
> Loan Amount :  5000.0 
> Disbursal date :  08/09/2010 
> Example of loan schedule below:
> Installments 
> Amount due 
>  
> Installment   DueDate Principal       Interest        Fees    Total
> 1     01-Oct-2010     5000.0  1350.0  0.0     6350.0
> Due date should be 1-June-2011 and not 01-OCT-2010, as shown above.
> Please note that this bug only happens whenever LSIM is activated in the 
> configuration table in the database.

-- 
This message is automatically generated by JIRA.
-
If you think it was sent incorrectly contact one of the administrators: 
http://mifosforge.jira.com/secure/Administrators.jspa
-
For more information on JIRA, see: http://www.atlassian.com/software/jira

       

------------------------------------------------------------------------------
The ultimate all-in-one performance toolkit: Intel(R) Parallel Studio XE:
Pinpoint memory and threading errors before they happen.
Find and fix more than 250 security defects in the development cycle.
Locate bottlenecks in serial and parallel code that limit performance.
http://p.sf.net/sfu/intel-dev2devfeb
_______________________________________________
Mifos-issues mailing list
[email protected]
https://lists.sourceforge.net/lists/listinfo/mifos-issues

Reply via email to