Hello, On Jan 30 at 15:52 -0800, [email protected] wrote: > I have just recently started using Mnemogogo, but I have noticed > that my scheduled cards are out of sync between Mnemosyne and > Mnemogogo. > > For example: When I export to Mnemogogo it shows that I have 16 > cards scheduled for tomorrow, however when I import back to > Mnemosyne it shows that I have 16 cards scheduled for the day AFTER > tomorrow and nothing for tomorrow.
Could you please open the CONFIG file exported by Mnemogogo (using Notepad or similar) and check the line that begins with "start_date=" and "start_days="? Normally, these values should be "1970-01-01" and "0", respectively, but they may be "1969-12-31" and "-1", in which case the schedule in Mnemododo will be one day off. > I looked in the forum for similar problems and came across a post > with a similar issue. In that instance, it turned out to be a > timezone problem between the two devices. I have checked and double > check, and I am sure that time zones and local time are the same for > my phone and my computer. The discrepancy with start_date and start_days caused this problem for somebody else. I still haven't figured out why the exported values are incorrect (and why the problem was only reported so recently), but I will do so soon. @Peter, did the start date adjustments during upgrade from Mnemosyne 1.x change within the last four or so months? Tim.
signature.asc
Description: Digital signature
