Having a bit of an issue with fullcalendar and Model-Glue. I have an event
that displays a view with fullcalendar embedded. If the javascript for
fullcalendar calls an event of "getCalendarData" the event will return the
json back to fullcalendar with no problem and thru normal model-glue
structure. In other words the event will fire and model glue will pick it
up, go to the model, back to controller/XML, and then to a view that just
dumps the json for fullcalendar to consume.
The problem is to get this demo to work I have to hard-wire the start and
end dates coming in to getCalendarData. The controller is not picking
those up from fullcalendar's request. It seems as if the controller is
getting its info for getValue("start"), etc. from the "outside" event (the
one that displays the whole page containing the fullcalendar) rather than
the "inside" event called by fullcalendar from the view. Of course,
there's no such URL var in the outside event. Oddly, though, the info
requested (calendar data) if start/end hardwired is going back to
fullcalendar from the "inside" event with no problem on every change of the
calendar (new day, week, etc.) while sitting on the unchanging "outside"
event.
I was hoping to keep the fullcalendar calls within the framework. Am I
missing something?
Thank you!
--
Model-Glue Sites:
Home Page: http://www.model-glue.com
Documentation: http://docs.model-glue.com
Bug Tracker: http://bugs.model-glue.com
Blog: http://www.model-glue.com/blog
You received this message because you are subscribed to the Google
Groups "model-glue" group.
To post to this group, send email to [email protected]
To unsubscribe from this group, send email to
[email protected]
For more options, visit this group at
http://groups.google.com/group/model-glue?hl=en