Having a bit of an issue with fullcalendar and Model-Glue.  I have an event 
that displays a view with fullcalendar embedded.  If the javascript for 
fullcalendar calls an event of "getCalendarData" the event will return the 
json back to fullcalendar with no problem and thru normal model-glue 
structure.  In other words the event will fire and model glue will pick it 
up, go to the model, back to controller/XML, and then to a view that just 
dumps the json for fullcalendar to consume.  

The problem is to get this demo to work I have to hard-wire the start and 
end dates coming in to getCalendarData.  The controller is not picking 
those up from fullcalendar's request.  It seems as if the controller is 
getting its info for getValue("start"), etc. from the "outside" event (the 
one that displays the whole page containing the fullcalendar) rather than 
the "inside" event called by fullcalendar from the view.  Of course, 
there's no such URL var in the outside event.  Oddly, though, the info 
requested (calendar data) if start/end hardwired is going back to 
fullcalendar from the "inside" event with no problem on every change of the 
calendar (new day, week, etc.) while sitting on the unchanging "outside" 
event.

I was hoping to keep the fullcalendar calls within the framework.  Am I 
missing something?

Thank you! 

-- 
Model-Glue Sites:
Home Page: http://www.model-glue.com
Documentation: http://docs.model-glue.com
Bug Tracker: http://bugs.model-glue.com
Blog: http://www.model-glue.com/blog

You received this message because you are subscribed to the Google
Groups "model-glue" group.
To post to this group, send email to [email protected]
To unsubscribe from this group, send email to
[email protected]
For more options, visit this group at
http://groups.google.com/group/model-glue?hl=en

Reply via email to