Hello all. Looking to do my first live SCCM 2007 SP2 R3 Secondary site DP migration process to SCCM 2012 SP1 DP. I am wondering if any one knows how much data is copied from the 2012 Server to the secondary site over the wan link, If that data is throttled, and is it possible to prestige the bits or use the Install media locally at the remote site to complete the migration process? I could not find much info online about this. And the Site I am want to do has a pretty bad wan link. Thanks Matt
- [mssms] RE: DP Migration process. Gerlak, Matthew
- RE: [mssms] RE: DP Migration process. Schwan, Phil
- RE: [mssms] RE: DP Migration process. Gerlak, Matthew

