I'm pretty sure I got this right, just wanted to get some clarification.

Machine with maint windows of 9AM-9PM every Saturday (ex: 1/24)
I deploy SUG on Friday (ex: 1/23) night that has 2 patches in it to a
collection with that machine in it.
Deployment runs on machine at 9AM on 1/24
Installs 1 patch successfully but fails on 1 patch
Machine reboots

The failed patch won't try to re-install until the Software Updates \
Schedule deployment re-evaluation cycle runs again which by default is set
to every 7 days.  If we have it set to once a day if and the re-eval kicks
off Sunday (1/25) at 9AM since its outside the maintenance window the
failed patch won't attempt to reinstall until the maintenance window opens
back up on 1/30at 9AM.

Do I have that right?

Thanks


Reply via email to