Whatever your schedule is set to, it will run somewhere in between that time. If you set it to 3 days, it will run sometime in the next 3 days for its first run. For any I need quicker results, I usually start with 2-4 hours then change it afterwards once I have the data I need.
Daniel Ratliff From: listsad...@lists.myitforum.com [mailto:listsad...@lists.myitforum.com] On Behalf Of Robert Spinelli Sent: Wednesday, August 03, 2016 8:03 PM To: mssms@lists.myitforum.com Subject: RE: [mssms] DCM Delay - SCCM 2012 R2 I’m testing in my lab and 1 out 4 ran it about 2.5 hours after I deployed it and the other 3 still haven’t run it. I do see this In scheduler.log on the client.. [cid:image001.png@01D1EE29.95166E00] Allow randomization override = 0, which means it does randomize. The line above saying deadline = 1440 minutes is 24 hours, so looks like it might randomize over 24 hours? I think I’m going to just put a call into MS, since we pay them a boatload of cash. I should make them work for it. Thanks Rob From: listsad...@lists.myitforum.com<mailto:listsad...@lists.myitforum.com> [mailto:listsad...@lists.myitforum.com] On Behalf Of Sherry Kissinger Sent: Wednesday, August 3, 2016 4:23 PM To: mssms@lists.myitforum.com<mailto:mssms@lists.myitforum.com> Subject: Re: [mssms] DCM Delay - SCCM 2012 R2 Honestly, I never monitored. If I'm testing something against some test boxes, I just remotely trigger the policy refresh and then an eval. Once I send it to pilot or the entire target population, I just sit and wait for more results. On Wed, Aug 3, 2016 at 3:08 PM, Robert Spinelli <rspinell...@outlook.com<mailto:rspinell...@outlook.com>> wrote: I thought I remember that there is a 2 hour delay when you deploy a Configuration baseline to machine. Is that correct? Scenario 5 machines in a collection called DCMTEST Configuration Baseline called WinZip deployed to DCMTest collection set for compliance evaluation with simple schedule of every 3 days 5 machines pull policy and I see the Baseline in Configuration tab of SCCM control panel but Last Evaluation says N/A and Compliance Unknown When would you expect the baseline to run on all 5 machines? If there is a 2 hour delay they should all run today correct? It doesn’t spread it over 3 days that was set in simple schedule does it for all 5 machines. Thanks Rob -- Thank you, Sherry Kissinger My Parameters: Standardize. Simplify. Automate Blogs: http://www.mofmaster.com, http://mnscug.org/blogs/sherry-kissinger, http://www.smguru.org The information transmitted is intended only for the person or entity to which it is addressed and may contain CONFIDENTIAL material. If you receive this material/information in error, please contact the sender and delete or destroy the material/information.