> > I've noticed that the Modified date isn't always updated
> > correctly has anyone had this problem? Is there a way
> > to fix it?
>
> For me, that only used to happen if the dev environment was
> forcefully shut down, which happened a lot in VS 2002, but
> rarely on VS 2003.  Is that the case for you as well?

I've found that doing a "Save All" and/or closing the solution itself just
before closing down the devenv fairly much ensures that the date is updated,
correctly.

As with Ehsan, the only time I've seen a date not update properly is when the
devenv is forced to shutdown or crashes, or the system itself hangs or such.

Regards,
~TJ

--
"Growing old is mandatory; growing up is optional."



Reply via email to