Would like to add a second Win2K Terminal server in our company (small server farm) I know I need to purchase 2 copies of Advance Server and set-up Network Load Balancing between these servers and optionally 2 extra network cards. however do I also need to have exactly the same hardware as our current TS server? (PowerEdge 2400 dual P3) Are there other things I need to add to budget?
I would normally do research on this but boss hasn't given me much time to get quote in. TIA William. ------ You are subscribed as [email protected] Archives: http://www.swynk.com/sitesearch/search.asp To unsubscribe send a blank email to [EMAIL PROTECTED]
