I too would like to be able to keep my meetings and appointments in
MLO. This would allow me to have one place to keep both my tasks and
any other events simplifying the whole process of managing my time and
commitments. Switching between two different applications (e.g. MLO
and Outlook) is just not an optimal way of doing that in my opinion.
Also, I do think we should not be limited in discussing new features
by the fact that MLO was initially intended as a task outliner. I mean
having start and due dates, importance /priority sliders etc. already
goes (I think) beyond simply outlining tasks and into the area of
tasks management. And I think managing tasks is what majority of users
want to use the application for. And managing tasks, in my opinion,
involves being able to schedule them in a manner that ensures enough
time for their execution. The ability to ascertain task workload for
any given day would help in achieving this requirement. A requirement
that may not be what a task outliner is intended to do but one that
nevertheless constitutes a very real need and something I'm sure most
people would like the application to help with.

Having said that I've read through Steve's posts (as always very
articulate and well-written :) ) and decided to see what I can do to
help me meet my needs using the application as it is. And while I
still think some sort of a graphical display of how my week is shaping
up would be preferable I have to admit I can get what I'm after to
some degree with the current features.

Previous set-up and the inefficiencies:

I already had a view configured that groups tasks by due date and then
by project. I work primarily in the outline adding lots of tasks in
different places as I go through the day. At the end of the day (or
beginning of the week) I go through the outline and check which tasks
I want to or need to complete next day or the current week. Up till
now I'd need to switch (from outline) to my group-by-due-date view to
check which days I still have some spare time available, then switch
back to the outline and manually set a due date and assign a context.
This was a process that required a lot of clicking and switching and,
frankly, seemed highly inefficient. What I've come to realize though
that this was to a large extent due to my set-up. My group-by-due-date
view only showed tasks with a specific context (only tasks I'm really
committed to do which is a small subset of what I add to the outline
every day) and tasks with due dates assigned. Therefore, when working
in my outline and trying to schedule a task I'd need to switch to the
group-by-due-date view, check for a not too fully booked day, switch
back to outline (as the task I was working with didn't yet have a due
date or context and so would not appear in the due-date to-do view),
then assign context and due time.

New set-up and tasks scheduling:

Just a few tweaks to my methodology (as well as using two features I
hate to admit I wasn't aware of) made the whole process much more
efficient.
First, I changed my group-by-due-date to-do view to also show tasks
without a due date assigned. Second, I assigned a hot key to the view
itself (something I didn’t know was possible) and, third, I tried
dragging and dropping a task to an appropriate date group (e.g.
Wednesday) in the to-do view (something I picked up from Steve's
earlier post) and was surprised to see the tasks due date
automatically got updated to that of the group itself (Wednesday in
this case). This few changes have made my scheduling much more
efficient - how it goes is:

1) I go to outline, look through all tasks that have not been
scheduled yet
2) When I see a task I want to schedule I press a hot key to assign a
context (this context is used in my group-by-due-date to do view)
3) I press a hot key to switch to my group-by-due-date view
4) The view now shows the task I'm working with (the context has been
assigned and the view previously changed to also show tasks without
due date). I quickly browse through tasks scheduled for the next few
days (the view shows all scheduled tasks grouped by date), choose a
day (e.g. Friday) and simply drag the task into the group (Friday in
this case). Presto! No switching back and forth between the outline
and to-do list and, with all hot-keys being next to each other (e.g.
CTRL+ALT+D and CTRL+ALT+T), assigning context and switching to to-do
view is a breeze.

As I mentioned, I still feel this is not the optimal way of scheduling
my tasks and would love to see some sort of a graphical display of my
workload but have to admit using a few existing features (hot keys for
views and dragging a task to a group to make it inherit a due date)
have made my scheduling much more efficient.

There's still some limitations to this approach though:

1) Inability to precisely estimate my workload.
Looking at my group-by-due-date to-do view I can see how many tasks
have been scheduled for a given day. I cannot see, however, how much
time has been scheduled. Sometimes 5 tasks can be done in 2 hours
sometimes they will take me the whole day. I would love MLO to be able
to add up the "time required" values of all tasks in a group and
display the total in the group heading (e.g. Wednesday, 8 tasks, 4.5
hours min/ 6 hours max) - this would allow me to realistic scheduling
even without a graphical view (can't believe I've just said that).

2) Recurring tasks not showing as I expected.
Recurring tasks will not show properly in this kind of a setup which
greatly distorts the picture. I have quite a few tasks scheduled to be
recurring on different days. Sometimes they take up to 3 hours of my
day. Currently the recurring tasks only show in the next day they
scheduled for - any subsequent occurrences are not displayed. For
example, I have a 2-hour task recurring every Mon, Wed and Fri.
Currently, my group-by-due-date view will only show the task as
scheduled for Monday but not for Wed or Fri. It's only when I complete
the task on Monday that it appears on Wed. It will appear on Friday
only once the Wednesday one has been completed. As I mentioned, this
can really mess up my scheduling. Going with the above example - on a
Monday morning I'm doing my scheduling, I check the coming days and
see I still have some time on Wednesday and Friday. I assign some
tasks to these days. I then complete my 2-hour recurring task on
Monday and suddenly find I won't be able to complete all my tasks on
Wednesday as there is an additional 2-hour task scheduled for the day
that wasn't showing previously when I did my scheduling (as the Monday
occurrence was not completed at that time). The same goes for Friday.
I use recurring tasks quite extensively so this is a real issue to me.
I would like to see the option to display recurring tasks the same way
Outlook calendar does - that is by automatically creating and
scheduling all instances of the task rather than creating the next
occurrence only once the previous one has been completed.

Phew, a long post. However, I felt I really needed to research into
what I can do with the existing functionality before writing another
post and simply demanding a calendar functionality. Much as I hate to
admit it :)  ,I found some of Steve's arguments true - even if they
come in the form of a 2-page post every time :)  . Some of them I
still don't agree with though :) (e.g. MLO is a task outliner only)
Also, I hope describing my set up may help someone struggling with the
same challenges  when it comes to scheduling.

Best regards,
Greg Osimowicz

--~--~---------~--~----~------------~-------~--~----~
You received this message because you are subscribed to the Google Groups 
"MyLifeOrganized" group.
To post to this group, send email to [email protected]
To unsubscribe from this group, send email to 
[email protected]
For more options, visit this group at 
http://groups.google.com/group/myLifeOrganized?hl=en
-~----------~----~----~----~------~----~------~--~---

Reply via email to