I too would like to be able to keep my meetings and appointments in MLO. This would allow me to have one place to keep both my tasks and any other events simplifying the whole process of managing my time and commitments. Switching between two different applications (e.g. MLO and Outlook) is just not an optimal way of doing that in my opinion. Also, I do think we should not be limited in discussing new features by the fact that MLO was initially intended as a task outliner. I mean having start and due dates, importance /priority sliders etc. already goes (I think) beyond simply outlining tasks and into the area of tasks management. And I think managing tasks is what majority of users want to use the application for. And managing tasks, in my opinion, involves being able to schedule them in a manner that ensures enough time for their execution. The ability to ascertain task workload for any given day would help in achieving this requirement. A requirement that may not be what a task outliner is intended to do but one that nevertheless constitutes a very real need and something I'm sure most people would like the application to help with.
Having said that I've read through Steve's posts (as always very articulate and well-written :) ) and decided to see what I can do to help me meet my needs using the application as it is. And while I still think some sort of a graphical display of how my week is shaping up would be preferable I have to admit I can get what I'm after to some degree with the current features. Previous set-up and the inefficiencies: I already had a view configured that groups tasks by due date and then by project. I work primarily in the outline adding lots of tasks in different places as I go through the day. At the end of the day (or beginning of the week) I go through the outline and check which tasks I want to or need to complete next day or the current week. Up till now I'd need to switch (from outline) to my group-by-due-date view to check which days I still have some spare time available, then switch back to the outline and manually set a due date and assign a context. This was a process that required a lot of clicking and switching and, frankly, seemed highly inefficient. What I've come to realize though that this was to a large extent due to my set-up. My group-by-due-date view only showed tasks with a specific context (only tasks I'm really committed to do which is a small subset of what I add to the outline every day) and tasks with due dates assigned. Therefore, when working in my outline and trying to schedule a task I'd need to switch to the group-by-due-date view, check for a not too fully booked day, switch back to outline (as the task I was working with didn't yet have a due date or context and so would not appear in the due-date to-do view), then assign context and due time. New set-up and tasks scheduling: Just a few tweaks to my methodology (as well as using two features I hate to admit I wasn't aware of) made the whole process much more efficient. First, I changed my group-by-due-date to-do view to also show tasks without a due date assigned. Second, I assigned a hot key to the view itself (something I didn’t know was possible) and, third, I tried dragging and dropping a task to an appropriate date group (e.g. Wednesday) in the to-do view (something I picked up from Steve's earlier post) and was surprised to see the tasks due date automatically got updated to that of the group itself (Wednesday in this case). This few changes have made my scheduling much more efficient - how it goes is: 1) I go to outline, look through all tasks that have not been scheduled yet 2) When I see a task I want to schedule I press a hot key to assign a context (this context is used in my group-by-due-date to do view) 3) I press a hot key to switch to my group-by-due-date view 4) The view now shows the task I'm working with (the context has been assigned and the view previously changed to also show tasks without due date). I quickly browse through tasks scheduled for the next few days (the view shows all scheduled tasks grouped by date), choose a day (e.g. Friday) and simply drag the task into the group (Friday in this case). Presto! No switching back and forth between the outline and to-do list and, with all hot-keys being next to each other (e.g. CTRL+ALT+D and CTRL+ALT+T), assigning context and switching to to-do view is a breeze. As I mentioned, I still feel this is not the optimal way of scheduling my tasks and would love to see some sort of a graphical display of my workload but have to admit using a few existing features (hot keys for views and dragging a task to a group to make it inherit a due date) have made my scheduling much more efficient. There's still some limitations to this approach though: 1) Inability to precisely estimate my workload. Looking at my group-by-due-date to-do view I can see how many tasks have been scheduled for a given day. I cannot see, however, how much time has been scheduled. Sometimes 5 tasks can be done in 2 hours sometimes they will take me the whole day. I would love MLO to be able to add up the "time required" values of all tasks in a group and display the total in the group heading (e.g. Wednesday, 8 tasks, 4.5 hours min/ 6 hours max) - this would allow me to realistic scheduling even without a graphical view (can't believe I've just said that). 2) Recurring tasks not showing as I expected. Recurring tasks will not show properly in this kind of a setup which greatly distorts the picture. I have quite a few tasks scheduled to be recurring on different days. Sometimes they take up to 3 hours of my day. Currently the recurring tasks only show in the next day they scheduled for - any subsequent occurrences are not displayed. For example, I have a 2-hour task recurring every Mon, Wed and Fri. Currently, my group-by-due-date view will only show the task as scheduled for Monday but not for Wed or Fri. It's only when I complete the task on Monday that it appears on Wed. It will appear on Friday only once the Wednesday one has been completed. As I mentioned, this can really mess up my scheduling. Going with the above example - on a Monday morning I'm doing my scheduling, I check the coming days and see I still have some time on Wednesday and Friday. I assign some tasks to these days. I then complete my 2-hour recurring task on Monday and suddenly find I won't be able to complete all my tasks on Wednesday as there is an additional 2-hour task scheduled for the day that wasn't showing previously when I did my scheduling (as the Monday occurrence was not completed at that time). The same goes for Friday. I use recurring tasks quite extensively so this is a real issue to me. I would like to see the option to display recurring tasks the same way Outlook calendar does - that is by automatically creating and scheduling all instances of the task rather than creating the next occurrence only once the previous one has been completed. Phew, a long post. However, I felt I really needed to research into what I can do with the existing functionality before writing another post and simply demanding a calendar functionality. Much as I hate to admit it :) ,I found some of Steve's arguments true - even if they come in the form of a 2-page post every time :) . Some of them I still don't agree with though :) (e.g. MLO is a task outliner only) Also, I hope describing my set up may help someone struggling with the same challenges when it comes to scheduling. Best regards, Greg Osimowicz --~--~---------~--~----~------------~-------~--~----~ You received this message because you are subscribed to the Google Groups "MyLifeOrganized" group. To post to this group, send email to [email protected] To unsubscribe from this group, send email to [email protected] For more options, visit this group at http://groups.google.com/group/myLifeOrganized?hl=en -~----------~----~----~----~------~----~------~--~---
