I usually have Task templates containing sub-tasks.  I used this as a
list of things to be done but there were times when some of the task
are not required.  However, I still want them to remain in the list to
show that the tasks were considered but not required.  Rather than
checking it (which would mean completed), I would prefer X'ing it
(which would mean not required).  It would still behave like a checked
box except that the X symbol is used instead of a Check symbol.

Can we add this option in the future?  Like adding the option of X'ing
the box when you right click on the box.
--~--~---------~--~----~------------~-------~--~----~
You received this message because you are subscribed to the Google Groups 
"MyLifeOrganized" group.
To post to this group, send email to [email protected]
To unsubscribe from this group, send email to 
[email protected]
For more options, visit this group at 
http://groups.google.com/group/myLifeOrganized?hl=en
-~----------~----~----~----~------~----~------~--~---

Reply via email to