Do the following:

1. Select the project
2. Open (click) on the Effort section in the properties tab.
3. Set the Task Effort slider to minimum (far left).

Now when all the subtasks for the project are completed it will show
100% complete.

-Mike

On Aug 20, 4:02 pm, Fletcher <[email protected]> wrote:
> Hey, kids--
>
> I have a project that consists of 18 subtasks (with none of those
> having subtasks). All of the subtasks are complete, but the project
> shows 95% complete.
>
> Is this a bug or as-designed, but I don't get the design?
--~--~---------~--~----~------------~-------~--~----~