Hi.

If I have this right, two additional caveats should be added:

 

1.       In addition to making backups, if you are syncing with MLO/mobile
you should make sure that all of your platforms are fully synched just
before installing RC1.

2.       When using delayed dependency, make sure that  your trigger task
(the one the dependency points to) will not be scheduled for removal by
archive before the delay period completes.

 

-Dwight

 

From: [email protected]
[mailto:[email protected]] On Behalf Of Andrey Tkachuk (MLO)
Sent: Monday, June 24, 2013 11:32 AM
To: [email protected]
Subject: [MLO] MyLifeOrganized ver. 4.1.1 Release Candidate has been
pubished

 

You can try the new MyLifeOrganized Release Candidate before we publish it
as FINAL.


The full change log:
http://mylifeorganized.net/products/my-life-organized/change-log.htm


Downloads.
Installation:
http://mylifeorganized.net/downloads/files/beta/MLO-Setup.exe
Zip:
http://mylifeorganized.net/downloads/files/beta/MLO.zip


This is not a FINAL release yet. Please note that the data file format will
be changed with this new version so please make backups of your data files
if you plan to return to the previous version.

Andrey. 

-- 
You received this message because you are subscribed to the Google Groups
"MyLifeOrganized" group.
To unsubscribe from this group and stop receiving emails from it, send an
email to [email protected].
To post to this group, send email to [email protected].
Visit this group at http://groups.google.com/group/mylifeorganized.
For more options, visit https://groups.google.com/groups/opt_out.
 
 

-- 
You received this message because you are subscribed to the Google Groups 
"MyLifeOrganized" group.
To unsubscribe from this group and stop receiving emails from it, send an email 
to [email protected].
To post to this group, send email to [email protected].
Visit this group at http://groups.google.com/group/mylifeorganized.
For more options, visit https://groups.google.com/groups/opt_out.


Reply via email to