Advanced Filter settings are default for "By due date" view (DueDateTime / 
Exists).

On Friday, March 13, 2015 at 1:53:54 PM UTC-7, pottster wrote:
>
> Just a quick thought. You mentioned you were playing around with advanced 
> filter settings. Is that unchecked now? (can't tell from your screenshots)
>
> On Friday, 13 March 2015 18:15:36 UTC, JL Fitzpatrick wrote:
>>
>> Using MLO specifically as a Project Management Tool. Each Project has 
>> numbered task and subtask labels which I organize our server files and cost 
>> codes by so everything is organized the same for reference. 
>>
>> For my To-Do view I primarily use By due date but turn hierarchy on so 
>> things are listed by Project. I've experimented some with advance filters, 
>> but this has not turned out to be an intuitive tool for me. (Adding "AND" 
>> and two parent filters, everything disappears. Actions are always set to 
>> "All".
>>
>> I have the tasks and sub-tasks arranged in what seems like a logical 
>> manner, much like I would run a Schedule. Many tasks will have several 
>> sub-tasks in the same level all with different Due Dates which are checked 
>> off when complete. I don't generally update the due date if a Consultant 
>> misses his commitment so it shows up for my records when I search by Code. 
>> Therefore I generally look at due dates simultaneously in the past and 
>> present in one view. I would however prefer not to show the completed tasks 
>> to focus on incomplete items but when I select Show Completed: "No" those 
>> incomplete subtasks listed alongside completed subtasks disappear from the 
>> To-Do view (By due date, hierarchy "On").
>>
>> Is there some hierarchy requirement or filtering option I'm missing here? 
>> If the view is set to show all tasks by due date, why do some disappear 
>> when incomplete tasks are hidden? Would love to just see all incomplete 
>> tasks in hierarchy order with whatever due date was assigned otherwise the 
>> To-Do view is just the same as the Outline (?)
>>
>> Screenshots attached, Task is in Project; *5) RCC-R - PRD P14-0472, TTM 
>> 39534* 
>>
>>
>>

-- 
You received this message because you are subscribed to the Google Groups 
"MyLifeOrganized" group.
To unsubscribe from this group and stop receiving emails from it, send an email 
to [email protected].
To post to this group, send email to [email protected].
Visit this group at http://groups.google.com/group/mylifeorganized.
To view this discussion on the web visit 
https://groups.google.com/d/msgid/mylifeorganized/02486129-7a26-4acf-b021-d7749c770846%40googlegroups.com.
For more options, visit https://groups.google.com/d/optout.

Reply via email to