Hi, Roberto.
I totally understand and agree with what you are saying about the need to combine automatic ordering of tasks with some human decisions about what is going to be done first.

Here is how I deal with it. This may not be a good answer for you, but it works for me and it might be interesting for you to think about.

I assign "importance" values consistent with the order in which I want things to happen. Most people only use importance values from 100(default) to 200. I use them all. For example I have a checklist of things that I want to get done in the first hour of every day before I move on to the day's projects. They are numbered between 170 to 190. Urgent things and emergencies go in 191-199. 200 is for something that absolutely has to be next. Do you get the idea? Then, if I have something I have decided to work on today I turn on the star. So I might have several unstarted projects around #90 priority but one of them, that I want to start today, will be starred. So when I get to #90 in my list, the starred one stands out.

My "Daily" view is sorter first by importance, then by starred, and then by date modified. That last part creates FIFO (first in/first out) queues. For example, interesting things to read are at priority 40. There are a lot of them. By sorting on modified date I know that the one that has been waiting the longest is at the top. When I get to priority 40 if I dont feel like reading that particular item I have two choices. I could mark it complete, meaning I'm never going to read this, or I could modify it (for example, add a blank character to the Note). Modifying it gives it the newest modification date which drops it to the bottom of my reading queue. By the time it works its way back to the top maybe I will be ready to read it.

If I see something in the wrong place in my view it's easy to fix. Suppose that there's a task near the end of the daily routing that I really want to do sooner. I can just click on the Importance slider and hit the right arrow key on my keyboard. Each tap adds one to the importance and the task slowly climbs through the task list until it reaches the right place.

Importance, star, and modified date are all synched between MLO/Windows and MLO/Android so if I move a task up in the list by increasing importance, it moves up on both Windows and Android.
hth
-Dwight
MLO Betazoid on Windows, Cloud and Android SGN2
On 11/28/2015 4:46 PM, Roberto Penzo wrote:
What you see on automatic/manual sort is logical and at first times it was also 
my thought. So I started using only automatic order to get the sequence of the 
tasks for my personal / working activities.

But week by week I understood that the activities need to be considered also 
with *human* principles. So I finally came to consider the priorities and 
automatic planning as a good suggestion to schedule my day-by-day list.

This list is a subset of the automatic sortinging, composed taking tasks from 
2-3 lists (long range, middle range and daily maintenance tasks), manually 
ordered to meet some simple principles; example: first the activities outside 
my home, then the activities at home. Or other equally simple.

So the manual sort is very nice, very useful. It is for me a sort of "what I really 
have decided to do today". The effort to decide what tasks and in which order is 
very useful for my mind and for my committment.


--
You received this message because you are subscribed to the Google Groups 
"MyLifeOrganized" group.
To unsubscribe from this group and stop receiving emails from it, send an email 
to [email protected].
To post to this group, send email to [email protected].
Visit this group at http://groups.google.com/group/mylifeorganized.
To view this discussion on the web visit 
https://groups.google.com/d/msgid/mylifeorganized/565A82CF.8030201%40dwightarthur.us.
For more options, visit https://groups.google.com/d/optout.

Reply via email to