I use the manual ordering in the To-Do view, and used the mouse to drag 
them around all the time.

Now in MLO 6 I notice that trying to drag a task in the To-Do view no 
longer works if the task is not selected first. It instead allows you to 
select multiple tasks with the mouse.

This change has slowed me down terribly. Now I need to remember to click on 
the task first, and then drag it.

I would respectfully request that this change be reverted, or that at least 
an option in Settings be introduced to disable it.

Is there a more formal way to place such a request?

Thanks.

-- 
You received this message because you are subscribed to the Google Groups 
"MyLifeOrganized" group.
To unsubscribe from this group and stop receiving emails from it, send an email 
to [email protected].
To view this discussion on the web visit 
https://groups.google.com/d/msgid/mylifeorganized/f7ec963e-acb1-4d90-9cff-fbb91feaf16dn%40googlegroups.com.

Reply via email to