I use the manual ordering in the To-Do view, and used the mouse to drag them around all the time.
Now in MLO 6 I notice that trying to drag a task in the To-Do view no longer works if the task is not selected first. It instead allows you to select multiple tasks with the mouse. This change has slowed me down terribly. Now I need to remember to click on the task first, and then drag it. I would respectfully request that this change be reverted, or that at least an option in Settings be introduced to disable it. Is there a more formal way to place such a request? Thanks. -- You received this message because you are subscribed to the Google Groups "MyLifeOrganized" group. To unsubscribe from this group and stop receiving emails from it, send an email to [email protected]. To view this discussion on the web visit https://groups.google.com/d/msgid/mylifeorganized/f7ec963e-acb1-4d90-9cff-fbb91feaf16dn%40googlegroups.com.
