Looks very nice Frank.

How long does it take your CNC rig to make this part?

On 08/12/14 05:00 AM, Frank Schieschke wrote:

<https://lh6.googleusercontent.com/-8zn7uqughiQ/U-oBpXG-d7I/AAAAAAAAADE/li8W9BlNGHI/s1600/MVC-002F.JPG>

<https://lh5.googleusercontent.com/-lYAL00rp3gA/U-oBlBF2wqI/AAAAAAAAAC8/KURnSJET_bI/s1600/MVC-001F.JPG>

Today morning produce the switchbracket.
The holes are tapped with M2 thread.
In the pictures you see similar switches, i have not the original ones.
I ordered the screws (M2x4 countersunk) and when they arrive (2 days), i send the sample to Don (about 2-3 weeks standard mail).
Frank
--
You received this message because you are subscribed to the Google Groups "N8VEM-S100" group. To unsubscribe from this group and stop receiving emails from it, send an email to [email protected] <mailto:[email protected]>.
For more options, visit https://groups.google.com/d/optout.

--
Don Caprio
[email protected]

--
You received this message because you are subscribed to the Google Groups 
"N8VEM-S100" group.
To unsubscribe from this group and stop receiving emails from it, send an email 
to [email protected].
For more options, visit https://groups.google.com/d/optout.

Reply via email to