I've experimented with the cause/effect relationship of the NDO utils
running as the event broker, and I can say positively that it is
"causing" my service graphs to have lots of gaps for checks that write
metrics to RRD files.

I'm honestly at a loss as to why, though.

The load hasn't gone up on the nagios server (if anything, it's gone
down a bit).

The MySQL backend is very comfy (low load, again).

All rrd writes are done *within* the plugin (both with an apan wrapper
and custom scripts).

Yet, the checks appear to be happening (alerts are still going out,
etc).

Definitely perplexing.  Any ideas?

Attachment: signature.asc
Description: This is a digitally signed message part

Reply via email to