We have an RCP  tool which shows several Gantt charts simultaneously, embedded 
in different Parts. The problem is that it seems that the latest one becomes 
the one which keeping all the action even though the others should be doing.
The problem is not that important because it could be that the problem is in 
our code (I didn't find it though), but then I thought that maybe it's 
something internal to the Gantt: If GanttChart assumes there is only one object 
then it probably explains everything.
So in short: Is it possible to have multiple Gantt Chart objects?
Thanks a lot