can you share your code, and how you ran dijkstra and your graph structure
and perhaps your database?
Otherwise it's impossible to reproduce.

Michael

On Fri, Jun 19, 2015 at 11:32 PM, mayank gupta <[email protected]>
wrote:

> Hi,
>
> I have a graph with 3M nodes and 10M edges.
> I tried running Dijkstra to get all shortest path but it gets stuck
> indefinitely.
> I wrote a plugin to cut short Dijkstra for getting a single path upto a
> certain depth and that gave me an average response time of 40 seconds for
> depth 10.
>
> AllShortestPath however returns in average 4 seconds, sometimes returning
> >100 different paths. Is there anything I am missing because the
> performance difference seems significant.
>
> --
> You received this message because you are subscribed to the Google Groups
> "Neo4j" group.
> To unsubscribe from this group and stop receiving emails from it, send an
> email to [email protected].
> For more options, visit https://groups.google.com/d/optout.
>

-- 
You received this message because you are subscribed to the Google Groups 
"Neo4j" group.
To unsubscribe from this group and stop receiving emails from it, send an email 
to [email protected].
For more options, visit https://groups.google.com/d/optout.

Reply via email to