Got a pound of thermally conductive epoxy coming, $300 a pound.  I think if I 
fill the empty spaces with old nails before I pot the modules I can stretch it 
out!  Also thinking of putting in some vertical strips of PGS.

-- 
You received this message because you are subscribed to the Google Groups 
"neonixie-l" group.
To unsubscribe from this group and stop receiving emails from it, send an email 
to [email protected].
To post to this group, send an email to [email protected].
To view this discussion on the web, visit 
https://groups.google.com/d/msgid/neonixie-l/b7c33e7c-55e9-45c9-bfa7-e74081fef7ea%40googlegroups.com.
For more options, visit https://groups.google.com/groups/opt_out.

Reply via email to