You would need hundreds of 22V10's to do the watch; If the HV supply was redesigned, you could use a microcontroller, though I doubt you would have the power-savings I have.
I'll give you the SP-151 footprint & symbol files; when you have those working in gEDA tools I can provide the schematics and layout files. Unfortunately I can't provide any design support; very long list of projects I have to focus on. -- You received this message because you are subscribed to the Google Groups "neonixie-l" group. To unsubscribe from this group and stop receiving emails from it, send an email to [email protected]. To view this discussion on the web, visit https://groups.google.com/d/msgid/neonixie-l/9d686bf9-1638-474b-a1c0-5c4f2dcc0b91%40googlegroups.com.
