You would need hundreds of 22V10's to do the watch; If the HV supply was 
redesigned, you could use a microcontroller, though I doubt you would have 
the power-savings I have.

I'll give you the SP-151 footprint & symbol files; when you have those 
working in gEDA tools I can provide the schematics and layout files.

Unfortunately I can't provide any design support; very long list of 
projects I have to focus on.

-- 
You received this message because you are subscribed to the Google Groups 
"neonixie-l" group.
To unsubscribe from this group and stop receiving emails from it, send an email 
to [email protected].
To view this discussion on the web, visit 
https://groups.google.com/d/msgid/neonixie-l/9d686bf9-1638-474b-a1c0-5c4f2dcc0b91%40googlegroups.com.

Reply via email to