The market is not standard, and some low-quality product quality, affect the 
healthy development of the industry - because the plastic pipe market is not 
standard, and some buyers 
[url=[http://vinylcompositeplank.com/teak-deck/6.html]composite](http://forum.nim-lang.org///vinylcompositeplank.com/teak-deck/6.html\]composite)
 wood 2x6 for roof[/url] who use the product is not the end, do not pay 
attention to the brand and quality, are formed on the market is not the same 
quality together with the presence of the product, and even some low post when 
the geology is very good product to sell, and PVC-U pipe is quite serious.

The cost of PVC-U pipes, the material quoted accounted for about 70% of the 
company through a single wall thickness is reduced, a lot of calcium carbonate 
and other methods to increase product 
[url=[http://vinylcompositeplank.com/teak-deck/]ECO](http://forum.nim-lang.org///vinylcompositeplank.com/teak-deck/\]ECO)
 Friendly Teak Deck[/url] costs decline, the formation of low-quality product 
quality. There's not the same as two or more companies to use the trademark 
quality, the use of low-level processing equipment, drinking water pipes lead 
salt stabilizer selected production methods to reduce costs, harm the interests 
of consumers and industry spoils the promise.
    Quality of construction projects should further improve --PVC-U pipeline 
project depends largely on the level of construction quality, good products and 
appropriate to ensure outstanding running ability construction pipeline systems 
engineering. Some engineering skills 
[url=[http://vinylcompositeplank.com/]Vinyl](http://forum.nim-lang.org///vinylcompositeplank.com/\]Vinyl)
 Composite Plank,Vinyl Composite Material Manufacturer[/url] of personnel lack 
professional training, follow metal tube method in practice for design and 
construction, there is a situation of non-standard construction, construction 
and other rough, not fully function both PVC-U pipes, as well as the formation 
of the pipeline damage. Some users still do not know the current plastic pipe 
according to how the procedure for the construction, supervision and other 
knowledge.

Reply via email to