Hi, On Tue, 02 Sep 2014 12:32:06 +0200, Vladimír Čunát <[email protected]> writes:
> On 09/02/2014 11:44 AM, Luca Bruno wrote: > Actually, if we look at diff from the last point of master merge > http://hydra.nixos.org/eval/1150396?compare=1149952 > then the number of new failures is ~250 (but 6k jobs still queued). > > The two test suite failures may likely have nothing with the changes > introduced in staging. I'll probably look closer after more of the > evaluation finishes, and e.g. try to reproduce them. > > Also pypy tests timeouted on i686-linux... Thanks for looking into this! If this turns out to be one of my changes ([email protected]), please CC me, sometimes I skip threads on the mailing list! Also, feel free to assign bugs to me on the github issues page when I'm at fault... Thanks, Gergely _______________________________________________ nix-dev mailing list [email protected] http://lists.science.uu.nl/mailman/listinfo/nix-dev
