Tsukikage7 commented on issue #3562:
URL: https://github.com/apache/dubbo-go/issues/3562#issuecomment-5165951800

   ## Workstream 6 progress: end-to-end sample PR
   
   The end-to-end observability sample has now been implemented in a separate 
samples PR:
   
   - PR: https://github.com/apache/dubbo-go-samples/pull/1128
   - Scope: runnable Dubbo Triple consumer/provider sample, Nacos discovery, 
OpenTelemetry Collector and OTLP HTTP, Jaeger, Prometheus, Grafana, 
trace-correlated logs, deterministic business-error validation, and bilingual 
documentation.
   - The PR description now contains the integration screenshots and the 
complete local validation flow.
   
   This PR is intentionally limited to the `dubbo-go-samples` repository. It 
does not modify or reimplement the core observability semantics tracked by 
`#3337`, `#3338`, `#3356`, `#3551`, `#3463`, or `#3568`. The sample is an 
integration-validation and documentation slice for Workstream 6, not a 
replacement for those core implementation issues.
   
   @Alanxtl @Saramanda9988 @jiaming2li @Modo-me @AlexStocks, please review the 
sample scope and call out any existing implementation, PR, branch, or sample 
that should be reused. In particular, please confirm that the telemetry 
validation flow and the documented ownership boundaries do not overlap with the 
current Metrics, Trace, Metadata, or protocol-error work.
   
   I will keep the Workstream 6 checklist open until the maintainers and 
current contributors confirm the boundary and the sample PR is reviewed.


-- 
This is an automated message from the Apache Git Service.
To respond to the message, please log on to GitHub and use the
URL above to go to the specific comment.

To unsubscribe, e-mail: [email protected]

For queries about this service, please contact Infrastructure at:
[email protected]


---------------------------------------------------------------------
To unsubscribe, e-mail: [email protected]
For additional commands, e-mail: [email protected]

Reply via email to